October 10, 2015

Start of final construction

After finishing the mock furniture, it's time to start the proper units.  I have opted for a driftwood units, topped with a black granite effect worktop.  All constructed with 15mm lightweight ply.

I've started on the large unit at the back, and the unit to house the fridge and the gas/water.  I'll get some more photos as the build progresses.



Lots to be getting on with over the next few days, I'll try and keep this updated as much as possible.

No comments:

Post a Comment