The main cupboard / wardrobe, with the tambour door fitted.
The lower shelf isn't secure in yet, as I need to make a trapdoor in it to access the Leisure battery.
Central cupboard finished which will house the water carrier and gas cylinder. Also behind the door will be a small concealed cutlery drawer.
The 'ikkle drawer!
Next up will be fitting and securing the furniture in place, then starting to wire up the electrics.