The main kitchen area and storage unit is now finished and secured down, the gas pipe is fitted, there is now the gas fallout through the floor, and the waste water outlet plumbed in.
I've also started the final part of the kick panel storage too, the door to hide the porta-loo, next to it will be a drawer for further storage. This is still to be finished, and find some suitable
Finally, I've added another small shelf at the back of the cupboard.
Hopefully another few hours, and the vast majority of this build should be complete.